Betekenis van:
deck up

to deck up
Werkwoord
  • optuigen
  • put on special clothes to appear particularly appealing and attractive

Synoniemen

Hyperoniemen

Hyponiemen

to deck up
Werkwoord
  • je feestelijk kleden; smakeloos opmaken, uitdossen
  • put on special clothes to appear particularly appealing and attractive

Synoniemen

Hyperoniemen

Hyponiemen

to deck up
Werkwoord
  • uitdossen
  • put on special clothes to appear particularly appealing and attractive

Synoniemen

Hyperoniemen

Hyponiemen

Werkwoord


Voorbeeldzinnen

  1. And there is one more method of climbing up to the slide deck.
  2. .7 Bulkhead deck is the uppermost deck up to which the transverse watertight bulkheads are carried.
  3. Check all ladders and outboard equipment are stowed or up on deck.
  4. 16 (Backup Ch.08). (h) Check all ladders and outboard equipment are stowed or up on deck.
  5. .1 A forepeak or collision bulkhead shall be fitted which shall be watertight up to the bulkhead deck.
  6. Where the partial watertight bulkhead does not line up with the bulkhead below, the bulkhead deck between shall be made effectively watertight.
  7. It shall not be necessary to climb more than two decks up or down in order to reach an assembly station or open deck from any passenger space.
  8. The panel shall be moved starting from the gangway of the lower deck up to the last step, in the probable direction of motion of a person using the staircase.
  9. .7 An afterpeak bulkhead, and bulkheads dividing the machinery space, from the cargo and passenger spaces forward and aft, shall also be fitted and made watertight up to the bulkhead deck.
  10. NEW CLASS B, C AND D AND EXISTING CLASS B SHIPS: .1 A forepeak or collision bulkhead shall be fitted which shall be watertight up to the bulkhead deck.
  11. Every ship shall be subdivided by bulkheads, which shall be watertight up to the bulkhead deck, into watertight compartments the maximum length of which shall be calculated according to the specific requirements given below.
  12. .6 An afterpeak bulkhead, and bulkheads dividing the machinery space, from the cargo and passenger spaces forward and aft, shall also be fitted and made watertight up to the bulkhead deck.
  13. .3 If the slide of a marine evacuation system in intended to provide the means of transfer of survivors to the deck of the ship, the slide shall be equipped with handlines or ladders to aid in climbing up the slide.
  14. .3 If the slide of a marine evacuation system in intended to provide the means of transfer of survivors to the deck of the ship, the slide shall be equipped with hand lines or ladders to aid in climbing up the slide.
  15. length between perpendiculars (LBP) is to be at least 3 m or a length corresponding to a model scale of 1:40, whichever is greater, and the vertical extent up to at least three superstructure standard heights above the bulkhead (freeboard) deck;